From Project to Operations: Human Resource Strategies as Key Success Factors for Jakarta-Bandung High-Speed Railway
Main Article Content
Ahmad Zaenudin*
Ocky Soelistyo Pribadi
Sri Handayani
The development of Indonesia’s first high-speed railway between Jakarta and Bandung marks a major transition from infrastructure delivery to full operational readiness, requiring not only physical assets but also competent human resources and an effective technology transfer process. This study examines human resource strategies for the Jakarta–Bandung High-Speed Railway, with a focus on workforce requirement planning, workforce fulfillment, and the localisation of operation and maintenance functions. A qualitative descriptive case study approach was employed, drawing on semi-structured interviews, field observations, and document analysis involving PT Kereta Cepat Indonesia China (PT KCIC), Chinese railway experts, the national railway regulator, and Indonesian railway training institutions. The findings indicate that workforce preparation is implemented through three interrelated strategies. First, a structured workforce requirement planning process integrates service plans, demand forecasting, and asset-based workload analysis, resulting in a projected requirement of 1,483 personnel to support 68 daily train services. Second, workforce fulfillment is conducted in phases through recruitment and secondment schemes, with 513 personnel prepared by mid-2023, leaving 970 positions to be filled. Third, localisation and technology transfer are guided by a roadmap implemented through consortium-based arrangements, staged training programs, and the gradual replacement of 812 Chinese experts in critical operational roles. The study underscores the importance of coherent human resource planning and regulation-aligned localisation strategies in ensuring safe, efficient, and sustainable high-speed rail operations in Indonesia.
Chen, C., & Vickerman, R. W. (2019). Quantifying the economic and social impacts of high-speed rail: Some evidence from Europe and the People’s Republic of China. ADBI Working Paper Series.
Chen, Z., & Haynes, K. E. (2016). A short history of technology transfer and capture: High speed rail in China. Available at SSRN 2872527.
Cresswell, J. W. (2008). Research design: Qualitative, quantitative and mixed methods approaches. Thousand Oaks, CA: Sage Publications.
Dharma, S., & Suryadinata, N. (2018). Jakarta-Bandung high speed rail project: Little progress, many challenges (2018; 2). ISEAS Yusof Ishak Institute. https://www.iseas.edu.sg/wp-content/uploads/pdfs/[email protected]
Faizah, F. A. (2021). Klausula Unforeseeable Difficulties dalam Penerapan Kontrak Engineering, Procurement and Construction dengan Standar Kontrak FIDIC Conditions of Contract for EPC/Turnkey Projects First Edition 1999 (Studi Pada Proyek Kereta Cepat Jakarta - Bandung). Universitas Indonesia.
Gui, T., Yuan, H., & Liu, Z. (2025). Spatiotemporal Evolution of 3D Spatial Compactness in High-Speed Railway Station Areas: A Case Study of Chengdu-Chongqing North–South Line Stations (2015–2025). Land, 14(6), 1275.
Harahap, N. (2020). Penelitian kualitatif. Wal ashri publishing.
Hayashi, Y., Seetha Ram, K. E., & Bharule, S. (2020). Handbook on high-speed rail and quality of life. In Handbook on High-Speed Rail and Quality of Life. https://ssrn.com/abstract=3637158
Jin, X., & Jin, M.-L. (2017). Firm performance and executive compensation structure. 3rd International Conference on Education and Social Development, 817–823.
Kadarisman, M. (2017). Kebijakan Transportasi Kereta Cepat Jakarta Bandung Dalam Mewujudkan Angkutan Ramah Lingkungan. Jurnal Manajemen Transportasi & Logistik (JMTRANSLOG), 4(3), 251–266.
Komobuchi, S. (2009). JR East’s Human Resource Development. Jap. Railway &transp. Rev, 12(54), 6.
Lawrence, M., Bullock, R., & Liu, Z. (2019). China’s high-speed rail development. World Bank Publications.
Nugrahani, F. (2014). Metode penelitian kualitatif dalam penelitian pendidikan bahasa. Cakra Books.
Octorifadli, G. P., Puspitasari, A., & Azzqy, A. A. R. (2021). Kepentingan Tiongkok terhadap Indonesia melalui Belt and Road Initiative dalam Pembangunan Kereta Cepat Jakarta-Bandung Periode 2015 –2020. Balcony, 5(2), 175–186.
Profillidis, V. (2016). Railway management and engineering. Routledge.
Ricardianto, P., Prakoso, B. D., Saputro, S. E., Majid, S. A., & Wibowo, H. (2020). The Comparison between High-Speed Trains in the World and the Potential of Jakarta-Bandung Express Train in Indonesia. International Journal of Scientific Engineering and Science, 4(9), 27–35.
Rijali, A. (2019). Analisis data kualitatif. Alhadharah: Jurnal Ilmu Dakwah, 17(33), 81–95.
Riyanta, W., & Jannah, A. I. M. (2023). High speed railway operations expert training development in Indonesia. Jurnal Pendidikan Teknologi Dan Kejuruan, 29(1), 1–11.
Rusakova, O., & Bylkov, V. (2018). Formation of need for human resources in implementation of high-speed and superhigh-speed railway projects. International Conference" Aviamechanical Engineering and Transport"(AVENT 2018), 347–351.
Salim, W., & Negara, S. D. (2016). Why is the high-speed rail project so important to Indonesia (2016; 16). ISEAS Yusof Ishak Institute. https://www.iseas.edu.sg/wp-content/uploads/pdfs/ISEAS_Perspective_2016_16.pdf
Sugiyono. (2017). Metode Penelitian Kuantitatif Kualitatif dan R&D. CV. Alfabeta.
Syarief, F., Kurniawan, A., Widodo, Z. D., Nugroho, H., Rimayanti, R., Siregar, E., Isabella, A. A., Fitriani, F., Kairupan, D. J. I., & Siregar, Z. H. (2022). Manajemen sumber daya manusia. Penerbit Widina.